Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
05/07/2025

Siguenos en:

facebook twitter

 

Home ›

abastecimiento

The tunnel of Undurraga´s dam opens in 2014

Fri, 18/02/2011 (El Correo)

Guadiloba empty out water again

Sun, 20/02/2011 (Hoy)

The Parliament asks to impel a plan of integral management of the Umia river basin that assures the quality and supply

Fri, 18/02/2011 (Europa Press)

Tuvalu faces impending consequences of climate change

Thu, 17/02/2011 (Prensa Latina)

The Júcar guarantees the water existence for the growth of the city until 2030

Wed, 16/02/2011 (Información)

The dredging of the swamp of Benin could regenerate the coast abderitana

Mon, 14/02/2011 (La Voz de Almería)

Valencia installs a new system of water treatment by ultraviolet light

Tue, 15/02/2011 (El País)

The Life+ bets by the supply with wells and springs in the rural one

Tue, 15/02/2011 (La Opinión. A Coruña)

The Plan of the Tagus, on the right track

Thu, 10/02/2011 (ABC)

The Ministery of Environment and Ceuta affirm the guarantee of water supply for the Autonomous City

Wed, 09/02/2011

  • « first
  • ‹ previous
  • …
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad