Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
01/07/2025

Siguenos en:

facebook twitter

 

Home ›

caudales

The project unlocks the CHJ ravine promised Nules 2004

Tue, 09/06/2009 (Levante)

A river with margin recovery possibilities

Sun, 07/06/2009 (Faro de Vigo)

Over a million euros have benn invested in repopulating the margins of the Tagus-Segura

Tue, 02/06/2009 (La Verdad)

The CHE uses the Doppler technology, with acoustic waves, to measure the volume of the river Ebro

Wed, 03/06/2009 (Europa Press)

Alsasua is concerned about the decline in the level of the reservoir Urdalur

Tue, 02/06/2009 (Diario de Noticias de Navarra)

Cleaning the water channels

Thu, 28/05/2009

The farmers claim that the Guadalquivir river continues suffering from a high salinity

Thu, 14/05/2009 (Diario de Sevilla)

The lack of rain provide the sixth consecutive decline in the water reservoir

Wed, 13/05/2009 (EFE)

A report anticipates a decrease of 20% in the volume of the river Júcar

Fri, 08/05/2009 (Levante)

An agreement between the University of Extremadura and the GHC allows scholarships for project development

Thu, 30/04/2009 (Europa Press)

  • « first
  • ‹ previous
  • …
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad