Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
01/07/2025

Siguenos en:

facebook twitter

 

Home ›

embalse

Barcelona reduces the water use in several services by the drought

Sat, 19/05/2007 (La Vanguardia)

The Plenary session approves hydraulic works in 18 localities by 600,000 euros

Thu, 17/05/2007 (El Día de Córdoba)

The CHJ notices that, in spite of rains, the situation continues being of “emergency” in the river basin of the Júcar

Thu, 17/05/2007 (Europa Press)

The hydraulic reserve grows until 64.8% of its capacity

Fri, 18/05/2007 (Expansión)

A project will optimize the management on the basis of water-bearing and the Júcar river

Fri, 18/05/2007 (La Verdad)

The drought follows in all the territory of Cataluña in spite of rains

Fri, 18/05/2007 (Expansión)

Narbona notices Spain has not recovered of drought even though raised reserve

Thu, 17/05/2007 (EFE)

The Generalitat maintains activated the decree of drought by the water shortage in the river basin of the Llobregat

Thu, 17/05/2007 (Europa Press)

The dams of the head of the Tajo river, Entrepeñas and Buendía, store 433 hectómetros, 11 more than the last week

Tue, 15/05/2007 (Europa Press)

Approved 15 million euros for the construction of two prey in the Palencia's region of Valdavia

Fri, 18/05/2007 (EFE)

  • « first
  • ‹ previous
  • …
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad