Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
25/06/2025

Siguenos en:

facebook twitter

 

Home ›

presa

The Three Gorges Dam threatens catastrophe

Thu, 27/09/2007 (Levante)

Narbona announces a decree including elements of the Water Law reform which do not need rank law

Wed, 26/09/2007 (Europa Press)

Narbona authorizes a modification of the project of increase of Yesa so that it is “the sooner” and he is safer

Fri, 07/09/2007 (Europa Press)

UAGA to protest against enlarging Yesa dam delay

Wed, 15/08/2007 (El Periódico de Aragón)

All 28 dams in Segura river, considered as 'maximum risk' in case of breakage

Mon, 13/08/2007 (La Verdad)

The CHG receives rates of 24 to 150 euros to sail in the dams of the Guadiana

Mon, 06/08/2007 (Hoy)

Director of the Andalusian Institute of Water says that the purification will be 'totally resolute' in less than ten years

Tue, 24/07/2007 (Europa Press)

The president of the Hydrographic Confederation of the Ebro assures that “we have not detected new cracks” in Yesa

Thu, 19/07/2007 (Europa Press)

Narbona unblocks the project of Yesa increased without new impact. The affected ones will be a day old to allege to the increase of the dam in 1,100 hectómetros

Mon, 09/07/2007 (El Periódico de Aragón)

A study confirms the existence of filtrations in the prey of Cornalvo

Mon, 02/07/2007 (Hoy)

  • « first
  • ‹ previous
  • …
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad