Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
20/06/2025

Siguenos en:

facebook twitter

 

Home ›

tajo

The Guadiana basin is at 76.5% of total capacity, and the Tajo, at 51.6%

Wed, 15/02/2012 (Lainformacion.com)

Spain and Portugal will create the first natural international park of UE

Tue, 14/02/2012 (EFE)

The municipalities of Ribera ask to Cospedal that the last transfer is appealed

Tue, 14/02/2012 (EFE)

The Platform thinks that is reckless transfer water to the Tajo in pre-alert

Mon, 13/02/2012 (EFE)

Drought threatens the Tajo and the transfer to the Segura is put at risk

Sat, 11/02/2012 (El País)

Lago claims that are set in the Tajo the environmental flows

Fri, 10/02/2012 (latribunadetoledo.es)

The Tajo enters pre-alert for drought

Fri, 10/02/2012 (El País)

Section transboundary of Tajo will have hydrological information system

Tue, 07/02/2012 (EFE)

The Platform of Tajo asks to stop the transfer of the first half year

Thu, 02/02/2012 (EFE)

The answer to the remaining irrigators depend on the basin plan figures

Fri, 30/12/2011 (La Opinión de Murcia)

  • « first
  • ‹ previous
  • …
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad