Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
21/12/2025

Siguenos en:

facebook twitter

 

Home ›

Obras hidráulicas

The tunnel of Undurraga´s dam opens in 2014

Fri, 18/02/2011 (El Correo)

Cristina and Lugo inaugurate hydroelectric Yacyretá

Sun, 20/02/2011 (Prensa Latina)

The Ministery of Environment will bid a package of water depuration works by 60 million

Fri, 18/02/2011

The Ministery of Environment destines 250,000 euros in environmental suitability of the Segre river in Balaguer (Lleida)

Wed, 16/02/2011

The Hydrographic Confederation of the Guadalquivir pleads so that the dredging of the Guadalquivir (Sevilla) has the conditioners and it doesn´t affect the rice culture

Wed, 16/02/2011 (Europa Press)

Aguilar bets by the new technologies as a key to confront environmental challenges

Tue, 15/02/2011 (Europa Press)

The works in the desalination plant of Marbella extend the supplying guarantee

Tue, 15/02/2011 (Sur)

Galicia provides the hydroelectric business with 147 power stations in it´s rivers

Thu, 10/02/2011 (La Voz de Galicia)

Parliament unanimously decided to veto the construction of more hydroelectric dams

Wed, 09/02/2011 (Faro de Vigo)

Natives protest in Brasilia against the construction of the third greater prey of the world

Wed, 09/02/2011 (Europa Press)

  • « first
  • ‹ previous
  • …
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad