Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
06/06/2025

Siguenos en:

facebook twitter

 

Home ›

desembalse

The Tajo River Basin celebrates the first meetings of the eight boards Operational Hydrologic Basin in this year

Mon, 30/04/2012 (Ministerio de Agricultura, Alimentación y Medio Ambiente)

Rain forces to extract water in the swamp of Ullibarri

Tue, 24/04/2012 (EFE)

Junta de Andalucía shows open to consider requests for desembalse of irrigators in the absence of rain

Thu, 01/03/2012 (Lainformacion.com)

Irrigators asked to advance the water outlet by the drought

Wed, 29/02/2012 (El País)

The eight unknowns of the new heads of the water

Mon, 09/01/2012 (La Verdad)

Reservoirs in the Muga and Ter release water to avoid risks

Thu, 17/11/2011 (La Vanguardia)

Añarbe Dam holds about 10 million cubic meters of water to avoid its contribution to Urumea

Mon, 07/11/2011 (Europa Press)

The limited reserves of the Ebro required to reduce the flow desembalsando Mequinenza

Fri, 28/10/2011 (Europa Press)

The CHS repeats desembalsando 2010 and maintains sufficient reserves for another year

Thu, 27/10/2011 (Información)

Desembalsando swamps to eliminate the risk of more flooding

Thu, 25/08/2011 (ABC)

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad