Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
15/07/2025

Siguenos en:

facebook twitter

 

Home ›

obras hidráulicas

ENDESA obtains the environmental authorization of the Hidroaysén Project in Chile

Fri, 13/05/2011 (La Provincia)

A technical conference analyzes the operation of more than twenty years of La Serena prey

Fri, 13/05/2011 (Europa Press)

Endesa will pay 10 million annually by the hydroelectric of Chira-Soria

Thu, 12/05/2011 (Las Provincias)

The earthquake of Lorca doesn´t produce important damages in the hydraulic infrastructure

Thu, 12/05/2011

The Hydrographic Confederaton of the Duero authorizes to Arrabalde to construct a beach in the Eria river “under their responsibility”

Tue, 10/05/2011 (La Opinión. El Correo de Zamora)

Patented a modular prey for streams made with plastic recycling

Sat, 07/05/2011

Junta of Castilla y León invests 3.2 million euros in the water supply in six towns of Leon and Palencia

Fri, 06/05/2011 (Europa Press)

Free route to the hydroelectric power station in the prey of the South

Fri, 06/05/2011 (La Provincia)

The School of Engineers of Ways, Channels and Ports of Galicia awards to the new waste water purifying station of Lugo, executed by the Hydrographic Confederation of Miño - Sil

Thu, 05/05/2011

The Xunta will bid this summer the works of the A Reigosa water purifier

Thu, 05/05/2011 (Faro de Vigo)

  • « first
  • ‹ previous
  • …
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad