Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
10/06/2025

Siguenos en:

facebook twitter

 

Home ›

hidroelectricidad

The public prosecutor retakes the investigation on the construction of a hydroelectric plant in the Sil

Fri, 11/09/2009 (La Opinión. A Coruña)

The councils enter in the society that will construct the new power station of Rioseco

Thu, 03/09/2009 (La Nueva España)

15,5 million for the hydroelectric power station of the Channel of Navarra

Fri, 28/08/2009 (Diario de Noticias de Navarra)

Adega will express it´s opposition against the works of Iberdrola in the Sil

Wed, 19/08/2009 (Europa Press)

The prey of Yacyretá, with the water to the neck

Fri, 14/08/2009

Iberdrola extracts energy of the water in Brazil with two new plants of hydraulic energy

Mon, 10/08/2009

Agents of the Xunta have denounced to the public prosecutor the works in the Sil

Sun, 09/08/2009

The documentation about the works of Iberdrola in the Sil, is already in the Office of the public prosecutor

Fri, 07/08/2009 (El Correo Gallego)

Iberdrola initiates the new power station in the Sil without license

Wed, 05/08/2009

Iberdrola initiates the new power station in the Sil without license

Tue, 04/08/2009 (El País)

  • « first
  • ‹ previous
  • …
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad